Total Galley Refurb for Seajacks Scylla

Successful delivery of new galley equipment took place onboard the Seajacks Scylla, the most advanced offshore wind farm installation vessel, ready for her imminent total #galley refurbishment.

With a helideck and a large deck space of 5000m², there’s plenty of room for the 130 residents to stretch their legs whilst on shift.

Scylla’s 105m long leg length and lifting capacity have been specifically designed for deep water – up to 65m deep – for the installation and maintenance of large #windfarm components.

She was originally commissioned in November 2015 and usually attains speeds of 12 knots and just over.

Facebook
Twitter
LinkedIn